Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/15/2008 | PLUMBING - FINAL | Approved | IVRS - Inspection :* GAS PIPING INSTALLED OK PRESSURE TEST OK PLUMBING FINAL OK |
|
| 08/12/2008 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* PER 301.1.2 2006 UPC EACH SECTION OF PIPE SHALL CARRY THE LISTING FOR THAT PIPE I.E A-53 OR A-53A IF GAS PIPING DOES NOT CARRY THE A53 DESIGNATION, IT IS DEEMED UNACCEPTABLE FOR NATURAL GAS. ONLY PIPING WITH THE A53 DESIGNATION WILL BE ACCEPTED. CONTINUED "NOT READY" WILL RESULT IN A REINSPECTION FEE. |
|
| 08/11/2008 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* THIS INSPECTION FOR CLOSET FLANGES RESTROOMS 108 & 110 OK |
|
| 08/04/2008 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1. RESTROOMS AVAILABLE IN PHASE ONE 2. INSULATE HOT WATER PIPING AT WATER HEATER 3. PHASE TWO RESTROOMS NOT COMPLETE REQUIRE CLEAN BACTERIA REPORT |