Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - GAS PRESSURE TEST
Permit Number - T08CM01481
Inspection Description - PLUMBING - GAS PRESSURE TEST
Inspection Status - Approved
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/19/2009 | PLUMBING - GAS PRESSURE TEST | Approved | IVRS - Inspection :* | |
| 06/18/2009 | PLUMBING - GAS PRESSURE TEST | Not ready for Inspection | IVRS - Inspection :* 1) TEST TO HOLD WITH NO LOSS OF PRESSURE 2) VENT ON HANGING HEATER TO GO IN UPWARD DIRECTION OF FLOW AT MINIMUM REQUIRED |
|
| 06/12/2009 | PLUMBING - GAS PRESSURE TEST | Partial Approval | ||
| 06/11/2009 | PLUMBING - GAS PRESSURE TEST | Partial Approval | IVRS - Inspection :* | |
| 06/10/2009 | PLUMBING - GAS PRESSURE TEST | Not ready for Inspection | IVRS - Inspection :* TEST TO HOLD WITH NO LOSS OF PRESSURE |
|
| 05/27/2009 | PLUMBING - GAS PRESSURE TEST | Denied | IVRS - Inspection : See detailed listing on site.| 999* PROVIDE A CITY APPROVED GAS PLAN FOR THIS 5 PSI SYSTEM VENTS FROM 5 PSI REGULATORS TO BE APPROVED MATERIAL MINIMUM 5' FROM ANY SOURCE OF IGNITITION |