Permit: T08CM01471

Parcel: 14041098A

Inspection Status: Approved

Inspection History: BUILDING PRE-SLAB

Permit Number - T08CM01471

Inspection Description - BUILDING PRE-SLAB

Inspection Status - Approved

Date Description Inspector Results Comments
05/12/2009 BUILDING PRE-SLAB Approved IVRS - Inspection :*
SPOKE WITH GLENN
02/26/2009 BUILDING PRE-SLAB Partial Approval IVRS - Inspection :*
1. WEST SIDE NORTH AND SOUTH POPOUT POUR BACKS
2. TERRACON SPECIAL INSPECTED EPOXY AND STEEL
02/25/2009 BUILDING PRE-SLAB Not ready for Inspection IVRS - Inspection :*
CANCELED BY CONTRACTOR
02/20/2009 BUILDING PRE-SLAB Partial Approval IVRS - Inspection :*
STEEL REINFORCEMENT @ POUR BACK CLOSURE STRIPS @ GRID 2/I TO J - 4.8 TO 5/D TO H - 4.8 TO 5/A TO D - A/3.5 TO 5 AND POUR BACK FOOTING 2/G TO I - M/1 TO 2 - 1/M TO P
AND P/1 TO 2 AND SLAB ON GRADE G.5 TO H.5/2.5 TO 4.5
02/19/2009 BUILDING PRE-SLAB Not ready for Inspection IVRS - Inspection :*
NO ONE ON SITE KNEW WHAT YOU CALLED ABOUT 2:10 P.M.
02/18/2009 BUILDING PRE-SLAB Not ready for Inspection IVRS - Inspection :*
REBAR LAYING IN GROUND
02/17/2009 BUILDING PRE-SLAB Partial Approval IVRS - Inspection :*
POUR BACK CLOSURE POUR @ 5/G.5 TO H.5, 5/A TO H,
AND 4.8 TO 5/H TO P
02/10/2009 BUILDING PRE-SLAB Not ready for Inspection IVRS - Inspection :*
01/09/2009 BUILDING PRE-SLAB Partial Approval IVRS - Inspection :*
STEEL REINFORCEMENT @ PRE-SLAB ON GRID A TO G/1 TO 2
OK SPECIAL INSPECTED
01/02/2009 BUILDING PRE-SLAB Partial Approval IVRS - Inspection :*
12/11/2008 BUILDING PRE-SLAB Partial Approval IVRS - Inspection :*
PRE-SLAB @ GRID LINES 2 TO 5/A TO F -- OK TO POUR
12/09/2008 BUILDING PRE-SLAB Partial Approval IVRS - Inspection :*
PRE-SLAB @ GRID LINES F TO J/2 TO 5 EXCEPT FOR BLOCK OUT @ GRID H/3 TO 4.5 FOR CHEVRON BRACE -- OK TO POUR
12/05/2008 BUILDING PRE-SLAB Partial Approval IVRS - Inspection :*
DOWEL BASKETS IN PLACE
OK TO POUR P TO J -- 2 TO 5
12/03/2008 BUILDING PRE-SLAB Partial Approval IVRS - Inspection :*
WORKING ON P TO J -- 2 TO 5
WILL CALL BACK TO SEE DOWEL BASKETS