Inspection Status: Approved
Inspection History: PLUMBING - ROUGH, SOIL
Permit Number - T08CM01383
Inspection Description - PLUMBING - ROUGH, SOIL
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
12/10/2008 | PLUMBING - ROUGH, SOIL | Approved | IVRS - Inspection :* | |
10/08/2008 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection :* CONTRACTOR CANCELED |
|
08/29/2008 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection :* CONTINUATION OF SANITARY DRAINAGE SYSTEM THRU BLD. WATER TEST UNDERGROUND OK CONTINUATION OF GREASE WASTE THRU BLD. SYSTEM WATER TEST UNDERGROUND OK PENDING REVISED CITY APPROVED PLAN OF REDLINE DRAWING ON SITE -- PLEASE POST YOUR ADDRESS |
|
08/25/2008 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection :* 1. ABS DWV ON THE SOUTHSIDE OF BLDG. INSTALLED PER 2006 UPC AS REDLINED ON PLUMBERS PLAN P-2 WATER TEST ONE RISER TO TEN FEET OK OK TO COVER SUBJECT TO REVISED APPROVED PLAN 2. OK TO COVER EXTERIOR PIPING INCLUDING INTERCEPTOR |
|
08/21/2008 | PLUMBING - ROUGH, SOIL | Not ready for Inspection | IVRS - Inspection :* AN APPEAL HAS BEEN MADE TO INSTALL PER I.P.C YOU MAY NOT COMBINE UPC AND IPC INSTALLATION NO PROVISION MADE IN IPC FOR HORIZONTAL VENTING BELOW THE FLOOD RIM, EXCEPT FOR "CHICAGO LOOP" PLEASE INSTALL PER ONE CODE, OR THE OTHER |
|
08/15/2008 | PLUMBING - ROUGH, SOIL | Not ready for Inspection | IVRS - Inspection :* |