Inspection History Details
Inspection Status: Approved
Inspection History: ENGINEERING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/23/2009 | ENGINEERING - FINAL | Approved | ||
| 01/22/2009 | ENGINEERING - FINAL | Correction Required | THE APPROVED SITE PLAN SHOWS THE ROOF DRAINS FOR THE BLDG AS 4" ABS FOR THE MAIN AND OVERFLOW, W/OUTLET AT BOTTOM OF BRICK COLUMNS AT FRONT OF STRUCTURE. CONTRACTOR TIED ROOF DRAINS INTO THE EXISTING SUBSURFACE STORM DRAINAGE PIPING VIA 160' OF 6" SCHEDULE 40 PVC @ 0.8% GRADE. PROVIDE A DRAWING FROM YOUR ARCHITECH/ENGINEER SHOWING THE ROOF DRAINS, MATERIAL USED, DIMENSIONS AND A DETAIL ON THE TIE-IN BETWEEN THE PVC AND EXISTING STORM DRAIN PIPING. |