| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/22/2010 | PLUMBING - INTERMEDIATE | Approved | ||
| 11/10/2010 | PLUMBING - INTERMEDIATE | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) NO CHANGE FROM LAST INSPECTION 2) CLOSET FLANGES SHALL NOT MOVE UP AND DOWN NOR SIDE TO SIDE WHEN THE INSPECTOR CHECKS THEM |
|
| 11/09/2010 | PLUMBING - INTERMEDIATE | Not ready for Inspection | IVRS - Inspection :* 1) CLOSET FLANGES ARE NOT SECURED TO FLOOR 2) OK TO RECOVER WALLS |
|
| 11/08/2010 | PLUMBING - INTERMEDIATE | Not ready for Inspection | IVRS - Inspection :* 1) CLOSET FLANGE TO EXTEND 1/4" ABOVE FINISHED FLOOR 2) URINAL RIM TO BE NO HIGHER THAN 17" AFF 3) REQUIRE 6" BETWEEN CRITICAL LEVEL AND TOP OF URINAL |
|
| 11/05/2010 | PLUMBING - INTERMEDIATE | Not ready for Inspection | IVRS - Inspection :* 1) NEED TO SEE CLOSET FLANGES 2) REQUIRE ACCESS PANEL FOR HAMMER ARRESTOR |
|
| 12/23/2009 | PLUMBING - INTERMEDIATE | Partial Approval | IVRS - Inspection :* 1) COPPER YARDWATER OK TO COVER |
|
| 02/06/2009 | PLUMBING - INTERMEDIATE | Partial Approval | IVRS - Inspection :* OK TO COVER ALL AREAS CALL O3035 FOR CLOSET FLANGES |
|
| 02/03/2009 | PLUMBING - INTERMEDIATE | Not ready for Inspection | IVRS - Inspection :* 1. URINAL REQUIRES A CLEANOUT 2. INSTALL ARMAFLEX IN WORKMANSHIP LIKE MANNER WITH TAPE AND LAGGING ADHESIVE 3. YOU MAY RECOVER THE UNDERGROUND 4. PROTECT ABS PASSING THRU METAL STUDS 5. COMPLETE THE WATER TEST |
|
| 02/02/2009 | PLUMBING - INTERMEDIATE | Not ready for Inspection | IVRS - Inspection :* INSTALL AVB ON HOSE BIB TODAY CONTINUED "NOT READY" MAY RESULT IN REINSPECTION FEE |
|
| 01/29/2009 | PLUMBING - INTERMEDIATE | Cancelled | IVRS - RI canceled | |
| 01/26/2009 | PLUMBING - INTERMEDIATE | Not ready for Inspection | IVRS - Inspection :* NOT READY FOR INSPECTION 1. HORIZONTAL X HORIZONTAL CHANGE OF DIRECTION TO BE A SWEEP 2. A CLEANOUT TEE IS NOT A DRAINAGE FITTING 3. PROTECT ABS FROM METAL STUDS USE CORRECT SIZE STRAPS 4. SUPPORT OVERHEAD PIPING 5. WATER PIPING NOT INSTALLED PER PLAN 6. MAY NOT BE A COMPLETE LIST THIS IS NOT A PUNCH LIST |