Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - ROUGH, SOIL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/18/2008 | PLUMBING - ROUGH, SOIL | Approved | IVRS - Inspection :* OK TO COVER |
|
| 11/17/2008 | PLUMBING - ROUGH, SOIL | Not ready for Inspection | IVRS - Inspection :* 1. VERTICAL BY HORIZONTAL CHANGE OF DIRECTION TO BE A SWEEP 2. CLEANOUTS SHALL OPEN IN THE DIRECTION OF FLOW |
|
| 11/13/2008 | PLUMBING - ROUGH, SOIL | Not ready for Inspection | 1. WHERE A VENT CONNECTS TO A HORIZONTAL DRAIN, IT SHALL HAVE ITS INVERT TAKEN OFF ABOVE THE DRAINAGE CENTER LINE, DOWNSTREAM OF THE TRAP BEING SERVED. 2. ABS TO BE LAID ON A FIRM BED, NO BRIDGING ALLOWED 3. FURNCO NOT PERMITTED UNDER THE BUILDING 4. VERTICAL X HORIZONTAL CHANGE OF DIRECTION TO BE A SWEEP 5. ALL PIPING BELOW SLAB TO HAVE 2% FALL UPPER TERMINAL C.O. TO BE FULL SIZE 3" BRANCH PIPING TO HAVE FULL SIZE CLEANOUT TEST ALL DWV PIPING TO TEN FEET |