Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/23/2009 | PLUMBING - FINAL | Approved | IVRS - Inspection :* | |
| 01/26/2009 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1. PROVIDE CLEANOUT COVERS IN SIDEWALK THAT ARE APPROVED FOR THAT APPLICATION AND DO NOT CREATE A TRIPPING HAZARD. 2. COMMERCIAL BUILDINGS REQUIRE OPEN FRONT SEATS ON STOOLS (TOILETS) 3. NOTE: FLUSH HANDLE TO BE TO OPEN SIDE OF RESTROOM ON TOILETS IN ADA FACILITIES 4. PROVIDE CHLORINE & BACTERIA REPORT FOR STERILIZATION OF BUILDING POTABLE WATER SYSTEM 5. VERIFY A FLASHING FOR ROOF PENETRATION OF VENT PIPE AND PAINT EXPOSED ABS VENT PIPE TO PROTECT FROM SUN DAMAGE 6. BACK WATER VALVE TO BE ACCESSIBLE FROM SURFACE AND ACCESS TERMINATED CORRECTLY. |