Inspection History Details
Inspection Status: Approved
Inspection History: BUILDING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/12/2009 | BUILDING - FINAL | Approved | IVRS - Inspection :* | |
| 06/10/2009 | BUILDING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) INSTALL DRIP LEG ON GAS LINE PRIOR TO IT ENTERING GAS PACK JACKET, ON H20 HEATER AND DRYER LINES 2) PAINT PLUMBING VENTS ON ROOF 3) FINISH CONDUIT CONNECTION TO BREEZEWAY A/C DISCONNECT BOX 4) INSTALL BACK FLOW PREVENTER VALVES ON HOSE BIBS 5) NEED WATER PIPES BONDED TO PANEL-AS GAS IS ? 6) SEE PAGE 10-CIRCUIT PANEL-STUDIO (2) AND STUDIO/HALL REQUIRE AFCI BREAKERS 7) IS H20 HEATER TPR DRAIN LINE PVC OR CPVC ? 8) CUT AND CAP ABS CLEANOUTS TO GRADE 9) LABEL SUB-PANEL BREAKERS 10) NO SUB PANEL GROUND ? |