| 10/05/2010 | FRAMING | Approved | IVRS - Inspection :* | |
| 09/29/2010 | FRAMING | Denied | ||
| 09/28/2010 | FRAMING | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) SUBMIT AS BUILT AIR ADMITTANCE VALVE IN LIEU OF 2" VTR BATH LAV OR BUILD TO PLAN. CHANGE FROM 2 TO 1 ? 2) SECURE ALL ROMEX 8" FROM BOXES 3) NAIL PROTECT PLUMBING |
|
| 09/22/2010 | FRAMING | Denied | 1) PVC FITTINGS AND PIPING AT WATER HEATED SUPPLY NOT ALLOWED IN WALLS 2) INSTALL AB'S AT SOLE PLATE PER PLAN/CODE |
|
| 09/17/2010 | FRAMING | Denied | 1) NAIL PROTECTION NEEDED ON WIRES 2) BOX VERIFIED NOT TO BE OVERLOADED 3) VACUUM BREAKER NEEDED AT EXT. HOSE BIB 4) MINIMUM CLEARANCE NEEDED ON PEX PIPING TO RECESSED LIGHT 5) NAIL PROTECT PEX IN FIRRED OUT BLOCK WALL 6) NAIL PROTECT WALL BEHIND STOOL |
|
| 08/03/2010 | FRAMING | Partial Approval | IVRS - Inspection :* 1) INTERIOR WALLS |