Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/31/2008 | PLUMBING - FINAL | Approved | IVRS - Inspection :* | |
| 10/02/2008 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* RAIN DRAIN TO CISTERN IS OK 1. PROVIDE CORRECT CONNECTION AND MATERIAL TYPE FOR EXPOSED PIPING FOR REVISION (1) RAIN DRAIN ONLY CONNECTION TO EXISTING PIPING TO RETENTION PONDS. |
|
| 10/01/2008 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* | |
| 09/22/2008 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* HANGERS TO BE PROPERLY INSTALLED TO THEIR LISTINGS. SEE NOTES ABOVE & COMPLY |
|
| 08/27/2008 | PLUMBING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1. PROVIDE AN APPROVED CAST IRON PERMANENT CAP ON OLD DRAIN PIPE WITH NO-HUB COUPLING 2. PROVIDE APPROVED PIPING MATERIAL WITH APPROVED COUPLINGS AND APPROVED SUPPORTS AT CORRECT INTERVALS 3. AT REINSPECTION AT TEST WILL BE REQUIRED ON THE NEW PIPING ON THE BUILDING INTERIOR |