Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Approved
Inspection History: ENGINEERING - FINAL
Permit Number - T08CM01129
Inspection Description - ENGINEERING - FINAL
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
08/28/2008 | ENGINEERING - FINAL | Approved | ||
08/27/2008 | ENGINEERING - FINAL | Not ready for Inspection | NOT READY CLEAN UP ALL CONSTRUCTION DEBRIS FROM NORTH SIDE OF BUILDING AND RECALL |
|
08/13/2008 | ENGINEERING - FINAL | Correction Required | research on open permits in this shell building | |
06/27/2008 | ENGINEERING - FINAL | Correction Required | SEE PICS 3049-3054 WASH OUT INTO RETENTION BASIN CALLED CHRIS LOVE WITH AEON 480-220-2444 AND ADVISED ALL MUST BE CLEANED UP |