Inspection History Details
Inspection Status: Approved
Inspection History: FRAMING
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/21/2008 | FRAMING | Approved | IVRS - Inspection :* | |
| 11/20/2008 | FRAMING | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) PVC NOT AN APPROVED MATERIAL FOR TPR LINE 2) ITEMS 2, 3, & 5 HAVE NOT BEEN MET |
|
| 11/18/2008 | FRAMING | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) NEED TO SUPPORT MAIN DUCT WITH NYLON STRAP 2) TPR LINE NEEDS TO HAVE GRAVITY FLOW 3) MISSING 2 PROTECTION PLATES IN MECHANICAL ROOM-DRYER VENT AND WASHER DRAIN 4) MISSING ATTIC ACCESS 5) NEED TO FIRE SEAL FURRED OUT WALLS 6) NEED UL LISTED BRACING ON RISER |
|
| 10/29/2008 | FRAMING | Partial Approval | IVRS - Inspection :* 1) PENDING INTERMEDIATES INSPECTIONS 2) ADD TRUSS BRACE MIDDLE OF HOUSE |