Inspection History Details
Inspection Status: Approved
Inspection History: ENGINEERING - FINAL
Permit Number - T08CM01026
Inspection Description - ENGINEERING - FINAL
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
11/18/2008 | ENGINEERING - FINAL | Approved | DO NOT RELEASE BOND. PER JIM FEMLING, OPEN GRADING PERMIT. | |
08/23/2008 | ENGINEERING - FINAL | Denied | Contractor needs to complete punch and separate all construction activity for public access. | |
08/22/2008 | ENGINEERING - FINAL | Denied | Complete punch list. | |
08/20/2008 | ENGINEERING - FINAL | Denied | Contractor needs to: 1. Provide site certification from engineer. Per C.O.T. Drainage Manual, chapter XIV, section 14.2 (7). 2. Complete all bike parking. 3. Complete all fine grading around site. 4. Stabilize all areas disturbed by construction. 5. Remove dumpster and port-a-potty for site. 6. Complete all striping. 7. Complete all sidewalk work, east and west side of building. 8. Install gates and fill bollards in trash enclosure. 9. Backfill all open holes and trenches on site. 10. Install all wheel stops. 11. Install HC ramp southeast corner of trash enclosure. 12. Complete all HC parking. 13. Install handrails for frontage access. (continuous both side) 14. Repair broken curb southwest entrance. 15. Remove all construction debris and equipment from site. 16. Complete all fence work. 17. Address side slopes next to southeast entrance. (HC ramp) 18. Complete drainage channel west side of building. 19. Provide positive drainage to water harvesting area. 20. Engineer needs to address drainage east side of building. 21. 60'X60' sand lot, minimum setback 10' from building. 22. Extend water harvesting area on east side of building. 23. All slopes to be verified on 8/21/08, AM. |