Inspection History Details
Inspection Status: Approved
Inspection History: ELECTRIC - TEMP POWER FOR TEST
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/15/2009 | ELECTRIC - TEMP POWER FOR TEST | Approved | IVRS - Inspection :* | |
| 07/24/2009 | ELECTRIC - TEMP POWER FOR TEST | Partial Approval | IVRS - Inspection :* | |
| 07/23/2009 | ELECTRIC - TEMP POWER FOR TEST | Denied | IVRS - Inspection : The wiring is not complete or does not comply with code.| 245* 1) FINISH #4 & 1 PREVIOUS INSPECTION |
|
| 07/22/2009 | ELECTRIC - TEMP POWER FOR TEST | Denied | IVRS - Inspection : The wiring is not complete or does not comply with code.| 245* PANELS: 1) HIGH LEG MARKINGS TO BE AS PER 110.15 2) FINISH PANEL MAKE UP 3) CLEAN EXCESS DIRT AND FOREIGN MATERIAL FROM BOTTOM OF PANELS 4) FILL UNUSED OPENING IN PANELS SERVICE: 1) LINE SIDE BOND JUMPER TO BE PER 250.102 AND 250.66 2) INSTRUCTIONS CALL FOR CABLE BRACING |
|
| 07/21/2009 | ELECTRIC - TEMP POWER FOR TEST | Denied | IVRS - Inspection : The wiring is not complete or does not comply with code.| 245* |
|
| 06/03/2009 | ELECTRIC - TEMP POWER FOR TEST | Cancelled | IVRS - RI canceled | |
| 06/03/2009 | ELECTRIC - TEMP POWER FOR TEST | Not ready for Inspection | IVRS - Inspection :* AREA FOR POWER IS STILL UNDER CONSTRUCTION AND HAS CONST. POWER |