Inspection History Details
Inspection Status: Approved
Inspection History: ENGINEERING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/31/2009 | ENGINEERING - FINAL | Approved | Approved | |
| 08/17/2009 | ENGINEERING - FINAL | Partial Approval | Complete the following items prior to final C of O. 1) Remove const. debris from site. 2) Remove temp storage containers or get a TUP from planning. 3) Drill holes for dumpster gate in open position. 4) Remove dumpster at building B. |
|
| 08/11/2009 | ENGINEERING - FINAL | Continued | Contractor called and requested an inspection for 8/14 |