Inspection History Details
Inspection Status: Approved
Inspection History: ENGINEERING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/09/2008 | ENGINEERING - FINAL | Approved | ||
| 11/26/2008 | ENGINEERING - FINAL | Denied | 1. CLEAN UP AND REMOVE ALL CONSTRUCTION MATERIAL AND DEBRIS, SWEEP ASPHALT PAVEMENT. 2. REMOVE PAINT AND CONCRETE WASHOUT FROM WASH BANKS AND FLOWLINE. 3. REPLACE MISSING BRICKS IN SIDEWALK. |