Inspection History Details
Inspection Status: Approved
Inspection History: ELECTRIC - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/03/2008 | ELECTRIC - FINAL | Approved | ||
| 08/29/2008 | ELECTRIC - FINAL | Not ready for Inspection | IVRS - Inspection :* 1. BOXES MORE THAN 1/4" BOX TO SURFACE 2. DISCONNECTING MEANS FOR FIXTURES 410 3. TIGHTEN ALL TERMINATIONS AT TRANSFORMER 4. ONLY ONE CONDUCTOR PER LUG TERMINATION 5. CANNOT STACK LUGS 6. FINISH POWER TO CHECK EM LIGHTING |
|
| 08/27/2008 | ELECTRIC - FINAL | Not ready for Inspection | IVRS - Inspection :* INSTALL AS PER NEC |