Inspection History Details
Inspection Status: Approved
Inspection History: EXCAVATION/LAYOUT REBAR & ZON
Permit Number - T08CM00837
Inspection Description - EXCAVATION/LAYOUT REBAR & ZON
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
09/11/2009 | EXCAVATION/LAYOUT REBAR & ZON | Approved | IVRS - Inspection :* | |
08/24/2009 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* 1) FOOTING AT WEST ENTRY RAMP FOR RETAINING WALL |
|
05/15/2009 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* 7 LIGHT POLE BASES ON NORTH SIDE OK |
|
04/23/2009 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* 1) 7 LIGHT POLE BASES AT EAST AND SOUTH SIDES OK |
|
03/25/2009 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* NORTH SIDE SITE RETAINING CMU RETAINING WALL 12" BLOCK FROM TOP OF FOOTING TO 4'8" - INSTALL 3" WEEP HOLES @ 6' O.C. AND PERF. PVC PIPE ON RETAINING WALL SIDE |
|
03/18/2009 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* 120 L.F. OF 6'8" RETAINING WALL FOOTING @ NORTH SIDE CENTER OF LOT BOUNDARY LINE - NEED SPECIAL INSPECTION - |
|
12/23/2008 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* SPREAD FOOTING @ K TO N/6 TO 7 OK SPECIAL INSPECTION |
|
12/17/2008 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* STEEL COLUMN SPREAD FOOTING @ 1/K TO L, 1/M TO N, 3/K TO L AND 3/M TO N -- SPECIAL INSPECTION PERFORMED AND CONCRETE WALLS @ ELEVATOR PIT @ GRID 7 TO 8/L TO L.5 FROM 0' TO 4'0" ABOVE T.O.F. |
|
12/11/2008 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* OK TO START SECOND STORY @ EAST END |
|
12/05/2008 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* | |
12/01/2008 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* | |
11/24/2008 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* AS PER DETAIL #2 ON SHEET S5.0 - BLDG. CENTER SPREAD FOOTING @ GRID LINES M TO X/6 TO 7 -- MUST HAVE ENGINEER APPROVAL FOR BLOCK OUT OF PLUMBING TUB BOXES W/APPROVED SIGNED BY ARCH. AND ENGINEER & STAMPED |
|
10/14/2008 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* WEST HALF OF BLDG. - SLAB INCLUDING SPREAD FOOTINGS @ GRID LINE 10/N-G - 9/G-D - 8/D-A - A/5-8 - 5/A-D 4/D-F & 3/F-K SPECIAL INSPECTOR APPROVED |
|
10/07/2008 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* CONTINUOUS FOOTINGS & COLUMN SPREAD FOOTINGS @ GRID LINES N TO X/3 TO 6 -- OK |