Permit: T08CM00837

Parcel: 13423424B


Addresses:

251 S WILMOT RD


Inspection Status: Approved

Inspection History: EXCAVATION/LAYOUT REBAR & ZON

Permit Number - T08CM00837

Inspection Description - EXCAVATION/LAYOUT REBAR & ZON

Inspection Status - Approved

Date Description Inspector Results Comments
09/11/2009 EXCAVATION/LAYOUT REBAR & ZON Approved IVRS - Inspection :*
08/24/2009 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
1) FOOTING AT WEST ENTRY RAMP FOR RETAINING WALL
05/15/2009 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
7 LIGHT POLE BASES ON NORTH SIDE OK
04/23/2009 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
1) 7 LIGHT POLE BASES AT EAST AND SOUTH SIDES OK
03/25/2009 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
NORTH SIDE SITE RETAINING CMU RETAINING WALL
12" BLOCK FROM TOP OF FOOTING TO 4'8" -
INSTALL 3" WEEP HOLES @ 6' O.C. AND PERF. PVC PIPE
ON RETAINING WALL SIDE
03/18/2009 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
120 L.F. OF 6'8" RETAINING WALL FOOTING @ NORTH SIDE CENTER OF LOT BOUNDARY LINE
- NEED SPECIAL INSPECTION -
12/23/2008 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
SPREAD FOOTING @ K TO N/6 TO 7 OK
SPECIAL INSPECTION
12/17/2008 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
STEEL COLUMN SPREAD FOOTING @ 1/K TO L, 1/M TO N, 3/K TO L AND 3/M TO N -- SPECIAL INSPECTION PERFORMED AND CONCRETE WALLS @ ELEVATOR PIT @ GRID 7 TO 8/L TO L.5
FROM 0' TO 4'0" ABOVE T.O.F.
12/11/2008 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
OK TO START SECOND STORY @ EAST END
12/05/2008 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
12/01/2008 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
11/24/2008 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
AS PER DETAIL #2 ON SHEET S5.0 - BLDG. CENTER SPREAD FOOTING @ GRID LINES M TO X/6 TO 7 -- MUST HAVE ENGINEER APPROVAL FOR BLOCK OUT OF PLUMBING TUB BOXES W/APPROVED SIGNED BY ARCH. AND ENGINEER & STAMPED
10/14/2008 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
WEST HALF OF BLDG. - SLAB INCLUDING SPREAD FOOTINGS @ GRID LINE 10/N-G - 9/G-D - 8/D-A - A/5-8 - 5/A-D
4/D-F & 3/F-K SPECIAL INSPECTOR APPROVED
10/07/2008 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
CONTINUOUS FOOTINGS & COLUMN SPREAD FOOTINGS @ GRID
LINES N TO X/3 TO 6 -- OK