Inspection History Details
Inspection Status: Approved
Inspection History: ENGINEERING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/10/2010 | ENGINEERING - FINAL | Approved | ALL ITEMS HAVE BEEN COMPLETED EXCEPT FOR THE REMOVAL OF THE TRASH DUMSTER, THIS WILL BE DONE WITHIN THE NEXT 2 WEEKS. I WILL RECHECK THE SITE BY THE 24TH TO VERIFY THAT ALL IS CLEAR FOR THE PUBLIC. | |
| 07/13/2010 | ENGINEERING - FINAL | Denied | PUNCH LIST. CONTRACTOR NEEDS TO COMPLETE THE FOLLOWING ITEMS PER PLAN. 1. H/C PARKING SPACES NEED TO BE COMPLETED PER PLAN, INCLUDING STRIPING OF ACCESS SPACE 2. PARKING LOT STRIPING NEEDS TO BE COMPLETED. 3. PARKING LOT DESIGN HAS BEEN REVISED. APPROVED REVISED DRAWINGS NEED TO BE PROVIDED. 4. BIKE RACKS NEED TO BE INSTALLED 5. DUMPSTER NEEDS TO BE RELOCATED TO REAR OF BLDG. AS INDICATED ON PLAN. PROVIDED APPROVED REVISED DRAWINGS WHERE NECESSARY. |