Inspection History Details
Inspection Status: Approved
Inspection History: MECHANICAL - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/18/2009 | MECHANICAL - FINAL | Approved | IVRS - Inspection :* | |
| 08/17/2009 | MECHANICAL - FINAL | Partial Approval | IVRS - Inspection :* 1) ITEMS 1 THRU 4 DATED 7/30/09 HAVE BEEN CORRECTED, STILL NEED BALANCE REPORTS 2) SEAL DUCT IN MECH ROOM |
|
| 07/30/2009 | MECHANICAL - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) ALL PVC TO HAVE PRIMED JOINT (PRIMER TO BE PURPLE IN COLOR) 2) ALL PVC EXPOSED TO EXTERIOR TO BE PAINTED WITH LATEX PAINT AND TERMINATE AT AN APPROVED LOCATION 30 PROVIDE SEDIMENT TRAP AT GAS INLET TO FAV 4)PROVIDE SECONDARY DRAIN AT AC CIOL 5) PROVIDE AIR BALANACE REPORT |