Inspection Status: Approved
Inspection History: ENGINEERING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/24/2008 | ENGINEERING - FINAL | Approved | ||
| 08/07/2008 | ENGINEERING - FINAL | Not ready for Inspection | 1) COMPLETE PAINTING. 2) COMPLETE OVERHEAD WORK AT MAIN ENTRANCE. 3) COMPLETE TRASH ENCLOSURE GATES 4) COMPLETE SISTERN PIPING FOR STORM WATER CONTROL 5) SEPARATE CONSTRUCTION DEBRI AND MATERIALS. |
|
| 08/01/2008 | ENGINEERING - FINAL | Partial Approval | THE SITE HAS BEEN GRANTED A TEMPORARY C OF O FOR THE INSTALLATION OF EQUIPMENT. THIS SITE IS SCHEDULED FOR A RE-INSPECTION ON 8/8/2008 TO ENSURE THAT ALL ITEMS ARE COMPLETE ENOUGH FOR THE ACCEPTANCE OF STUDENTS. | |
| 07/28/2008 | ENGINEERING - FINAL | Not ready for Inspection | PRIOR TO C OF O FOR ENGINEERING APPROVAL, PROVIDE THE FOLLOWING: 1) SAFE, UNOBSTRUCTED, ADA COMPLIANT ACCESS FOR PUBLIC AND OCCUPANTS OF BLDG. 2) SEPARATE REMAINING CONSTRUCTION FROM OCCUPIED SIDE OF BLDG. 3) PROVIDE PARKING AND TRASH SERVICE. 4) INSTALL ALL STORM WATER DRAINAGE PER APPROVED PLAN. |