Inspection History Details
Inspection Status: Approved
Inspection History: ENGINEERING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/26/2008 | ENGINEERING - FINAL | Approved | ||
| 09/25/2008 | ENGINEERING - FINAL | Denied | Contractor needs to: 1- Clean parking area. 2- Clean all wash out (front and rear of building). 3- Remove dumpster before final or move to rear of building for temp. 4- Separate all construction activity from public access. 5- Engineer needs to have ramps rear of building and near front door approved by Ron Brown. NOT TO CODE. 6- Repair all holes in asphalt. 7- Separate all construction debris from public access. |