Inspection History Details
Inspection Status: Approved
Inspection History: ENGINEERING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/28/2008 | ENGINEERING - FINAL | Approved | ACCESSIBLE PARKING DELETED FROM PLAN AS AN EXISTING CONDITION. IBC ACCESSIBILITY REQUIREMENTS MET ON THE INTERIOR. | |
| 08/27/2008 | ENGINEERING - FINAL | Partial Approval | OK FOR TEMPORARY C OF O FOR STOCKING AND FURNISHING ONLY. NOT TO BE OPEN FOR OCCUPANCY FOR PUBLIC ACCESS UNTIL A.D.A. ACCESS AND PARKING IS COMPLETED. 1. PROVIDE MAX. 2% SLOPE IN ALL DIRECTIONS AT HANDICAP PARKING SPACE AND ACCESS AISLE. 2. PROVIDE MAX. 2% CROSS SLOPE AND 5% RUNNING SLOPE ON ACCESS WALKWAY. 3. INSTALL CURBING PER ARCHITECTS DIRECTION. 4. PROVIDE A REVISED AND C.O.T APPROVED SITE PLAN WITH ALL MODIFICATIONS. 5. CLEAN UP AND REMOVE ALL CONSTRUCTION MATERIAL, DEBRIS, PAINT WASHOUT, GROUT WASHOUT AND ROLL-OFF AT REAR OF BUILDING. RON 609-7300 |
|
| 08/25/2008 | ENGINEERING - FINAL | Not ready for Inspection | PROVIDE ADA COMPLIANT ACCESS. PER ADA (28 CFR CH 1 4.3.7) NOWHERE SHALL THE CROSS SLOPE OF AN ACCESSIBLE ROUTE EXCEED 1:50 (2%). PER ADA (28 CFR CH 1 4.7.6) BUILT UP CURB RAMPS SHALL BE LOCATED SO THAT THEY DO NOT PROJECT INTO VEHICULAR TRAFFIC LANES. CALL FOR RE-INSPECTION |
|
| 08/25/2008 | ENGINEERING - FINAL | Denied | CONSTRUCT HANDICAP PARKING AND ACCESS ROUTE TO A.D.A. STANDARDS. |