Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/13/2008 | PLUMBING - FINAL | Approved | IVRS - Inspection :* | |
| 03/12/2008 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* - WILL REQUIRE APPROVED ROOF JACK FOR ROOF PENETRATION - ROOFTOP PIPING TO BE BLOCKED AND STRAPPED - MAY NOT SUPPORT THE PIPE BY THE DRIP LEG |
|
| 03/11/2008 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1. 1/2" PIPE AT 30' WILL HANDLE 95CFH ROOF TOP UNIT AT 69,000 BTU 2. REMOVE IN LINE PLUG COCK AT RISER INSTALL AGA OR CSA VALVE AT FLEX INSTALL SEDIMENT TRAP AT NEW UNIT INSTALL ROOF JACK AT PENETRATION SUPPORT PIPE BOTH VERTICALLY AND HORIZONTALLY 10# TEST ON ENTIRE SYSTEM |