Inspection Status: Approved
Inspection History: PLUMBING - INTERMEDIATE
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/09/2008 | PLUMBING - INTERMEDIATE | Approved | IVRS - Inspection :* | |
| 07/03/2008 | PLUMBING - INTERMEDIATE | Partial Approval | IVRS - Inspection :* CAST IRON 2ND FLOOR IN WALL OK (ONLY) |
|
| 07/01/2008 | PLUMBING - INTERMEDIATE | Partial Approval | IVRS - Inspection :* 1. CAST IRON ON TEST ON 2ND FLOOR SOUTH SIDE OK IN WALL 2. PROVIDE APPROVED SUPPORT IN WALLS ON ALL CAST IRON ON 2ND FLOOR SOUTHSIDE 3. INSTALL SANTEE STRAIGHT ON P-6 IN HALLWAY |
|
| 06/23/2008 | PLUMBING - INTERMEDIATE | Not ready for Inspection | IVRS - Inspection :* | |
| 06/20/2008 | PLUMBING - INTERMEDIATE | Denied | IVRS - Inspection : See detailed listing on site.| 999* CORRECT PIPE SLOPE, DOG LEGS AND SAGS PROVIDE 1/4" PER FOOT USE A GRADE LEVEL TO ENSURE PROPER INSTALLATION |
|
| 06/05/2008 | PLUMBING - INTERMEDIATE | Partial Approval | IVRS - Inspection :* 1. WATER PIPING SIZING AND PRELIMINARY PRESSURE TESTS OK 2. ROUTE/AND SUPPORT PIPING IN A MANNER THAT ALLOWS CONTINUOUS PIPE INSULATION PER SPEC. 3. OK TO INSULATE 4. RETEST, SUPPORT AND SECURE PIPING AND RECALL FOR INSPECTION ALONG W/DWV TEST |