Inspection History: EXCAVATION/LAYOUT REBAR & ZON

Permit Number - T08CM00644

Inspection Description - EXCAVATION/LAYOUT REBAR & ZON

Inspection Status - Approved

Date Description Inspector Results Comments
03/02/2009 EXCAVATION/LAYOUT REBAR & ZON Approved IVRS - Inspection :*
FOOTING FOR TRASH ENCLOSURE; AS PER C.O.T DETAIL #109
OK TO POUR
02/25/2009 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
EAST STAIRWELL COLUMN AS PER COLUMN SCHEDULE S1.5;
OK TO GROUT PROGRESS AREA
02/06/2009 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
4 @ LIGHT POLE CAISSONS AS PER DETAIL #T-15
01/28/2009 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
WEST SIDE BASE FOR STAIR PEDESTAL - PER DETAIL #113,
PAGE S4.1; EAST SIDE: COLUMN FOOTING C-2, F-10 FOOTING
OK TO POUR
10/28/2008 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
HAMBRO SYSTEM IN PLACE --- SLABS POURED
10/09/2008 EXCAVATION/LAYOUT REBAR & ZON Not ready for Inspection IVRS - Inspection :*
1) 2ND FLOOR SLAB TO BE APPROVED POURED IN TWO FOURS NORTH PORTION FIRST POUR
09/05/2008 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
2 @ COLUMNS (INTERIOR) @ C.2/3.5, 4.2
4 @ COLUMNS (EXTERIOR)
08/12/2008 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
FOOTINGS @ LINES C.8/4.8, 3.7/C.2; C.2/4.2
COLUMN PEDESTALS 3.7/C.2, C.2/4.2; C/4 -- OK TO POUR
07/30/2008 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
ELEVATOR PIT OK TO POUR - DETAIL #106 PAGE S4.1
07/22/2008 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
ELEVATOR PIT @ DETAILS #106, 106A - PAGE S4.1
OK TO POUR
07/09/2008 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
SE PORTION - COLUMN FOOTINGS (2) - LINES 4/D.5, 4.2/D, 5/B.75 - C.3
OK TO POUR PROGRESS AREAS
07/07/2008 EXCAVATION/LAYOUT REBAR & ZON Not ready for Inspection IVRS - Inspection :*
WATER IN FOOTINGS
06/19/2008 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
LINE A 1-5
LINE E 1-3.8
LINE 1
LINE 5 A-B.5
ALSO, F4 INTERIOR FOOTINGS LINE B & C