03/02/2009 | EXCAVATION/LAYOUT REBAR & ZON | Approved | IVRS - Inspection :* FOOTING FOR TRASH ENCLOSURE; AS PER C.O.T DETAIL #109 OK TO POUR |
|
02/25/2009 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* EAST STAIRWELL COLUMN AS PER COLUMN SCHEDULE S1.5; OK TO GROUT PROGRESS AREA |
|
02/06/2009 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* 4 @ LIGHT POLE CAISSONS AS PER DETAIL #T-15 |
|
01/28/2009 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* WEST SIDE BASE FOR STAIR PEDESTAL - PER DETAIL #113, PAGE S4.1; EAST SIDE: COLUMN FOOTING C-2, F-10 FOOTING OK TO POUR |
|
10/28/2008 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* HAMBRO SYSTEM IN PLACE --- SLABS POURED |
|
10/09/2008 | EXCAVATION/LAYOUT REBAR & ZON | Not ready for Inspection | IVRS - Inspection :* 1) 2ND FLOOR SLAB TO BE APPROVED POURED IN TWO FOURS NORTH PORTION FIRST POUR |
|
09/05/2008 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* 2 @ COLUMNS (INTERIOR) @ C.2/3.5, 4.2 4 @ COLUMNS (EXTERIOR) |
|
08/12/2008 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* FOOTINGS @ LINES C.8/4.8, 3.7/C.2; C.2/4.2 COLUMN PEDESTALS 3.7/C.2, C.2/4.2; C/4 -- OK TO POUR |
|
07/30/2008 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* ELEVATOR PIT OK TO POUR - DETAIL #106 PAGE S4.1 |
|
07/22/2008 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* ELEVATOR PIT @ DETAILS #106, 106A - PAGE S4.1 OK TO POUR |
|
07/09/2008 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* SE PORTION - COLUMN FOOTINGS (2) - LINES 4/D.5, 4.2/D, 5/B.75 - C.3 OK TO POUR PROGRESS AREAS |
|
07/07/2008 | EXCAVATION/LAYOUT REBAR & ZON | Not ready for Inspection | IVRS - Inspection :* WATER IN FOOTINGS |
|
06/19/2008 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* LINE A 1-5 LINE E 1-3.8 LINE 1 LINE 5 A-B.5 ALSO, F4 INTERIOR FOOTINGS LINE B & C |