Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/05/2008 | PLUMBING - FINAL | Approved | IVRS - Inspection :* | |
| 12/03/2008 | PLUMBING - FINAL | Not ready for Inspection | ALL HOSE BIBS REQUIRE AVB's UNABLE TO LOCATE PLANS, PERMIT AND INSPECTION HISTORY CONTINUED "NOT READY" MAY RESULT IN REINSPECTION FEE |
|
| 11/19/2008 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1. CLOSET BOND TO BE FLUSH WITH TOP OF CLOSET RING WITH NO FOULING EDGE AND SMOOTH INTERIOR WATER WAY IN RESTROOM #169 2. URINAL VACUUM BREAKER TUB TO HAVE MINIMUM 6" FROM TOP OF URINAL TO CRITICAL LEVEL MARK FOR URINAL FLUSH VALVE IN RESTROOM #173 |
|
| 09/25/2008 | PLUMBING - FINAL | Partial Approval | PARTIAL RESTROOMS #145 & 146, 126 & 139 OK TEMPERING IS AT WATER HEATER FOR PUBLIC USE LAVS |
|
| 09/18/2008 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* PUBLIC USE LAVS REQUIRE SOME FORM TO CONTROL HOT WATER TEMPERATURE NOT TO EXCEED 110 DEG. BESIDES THE WATER HEATER |