Permit: T08CM00612

Parcel: 11709001A


Addresses:

401 E 22ND ST

Inspection Status: Approved

Inspection History: EXCAVATION/LAYOUT REBAR & ZON

Date Description Inspector Results Comments
03/30/2009 EXCAVATION/LAYOUT REBAR & ZON Approved IVRS - Inspection :*
03/20/2009 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
BALANCE OF FENCE POST HOLES @ N/W SIDE (18)
03/13/2009 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
13 FENCE POST HOLES
18 LEFT AT NW SIDES
03/10/2009 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
1. REMAINING SKATE AREA FLAT WORK
2. 9 FENCE HOLES SOUTH 1/2
02/28/2009 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
1. FENCE POST FOOTINGS SOUTH SIDE AND 36' + OR -
ON SE SIDE
2. RFI 2/25/09 ADDED REBAR FOR COMPETITION BOWL OK
02/25/2009 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
1. COMPETITION BOWL BOTTOM
2. CONFORMATECH SPECIAL INSPECTED
3. WEST SIDE RAMP #3 12" O.C WALLS AND BOTTOM
DETAIL BEING SUBMITTED
4. CRUMB OUT
02/11/2009 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
AREAS AROUND COMPETITION BOWL
(EAST, NORTH OK TO POUR SLAB; 2 @ CANOPY SOUTH)
CAISSONS AS PER DETAIL TYPE #10 PAGE 3000 - OK TO POUR
02/05/2009 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
SIDEWALK INFILL ON SOUTH SIDE #3 18" O.C. EACH WAY AND DOWELS TO EXISTING SLAB
01/28/2009 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
1. SLABS - SOUTH 1/2 OK TO POUR REMAINING
2. HOLES FOR 4 GATE POSTS IN SLAB OK 4' X 12"
01/20/2009 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
WEST SIDE OF KIDNEY BOWL; SURROUNDING SNAKE RIVER
01/13/2009 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
3 - SKATE BENCHES REINFORCEMENT STEEL OK
12/19/2008 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
KIDNEY BOWL BOTTOM
12/18/2008 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
1. FLAT BOTTOM ON SNAKE RUN
2. COMPITATION BOWL WALL AND BOND BEAM EXCEPT W 15'
3. CONFORMA TECH SPECIAL INSPECTED
12/17/2008 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
4 LIGHT POLE BASES
12/12/2008 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
STEEL REINFORCEMENT @ TOJO SKATE ONLY -- FLAT WORK AT BOTTOM TO BE INSPECTED AND POURED LATER
12/11/2008 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
WORKING ON SNAKE RUN
NEED TO CALL BACK BEFORE SHOTCRETE