Inspection History Details
Inspection Status: Approved
Inspection History: ELECTRIC - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/07/2008 | ELECTRIC - FINAL | Approved | IVRS - Inspection :* 1) OK FINAL 2) FINISH PANEL LABELING 408.4 3) PROTECT CONDUCTOR 300.4 & A/C DISCO |
|
| 07/22/2008 | ELECTRIC - FINAL | Not ready for Inspection | IVRS - Inspection :* 1. NO FINAL INSPECTION UNTIL POWER TURNED ON 2. TO GET SERVICE ENERGIZED COMPLETE THE FOLLOWING: A. REMOVE #2 JUMPER TO METER B. BOND NIPPLE BETWEEN METER & SERVICE DISCONNECT C. GROUND TO PANEL TO BE #6 D. MAST SUPPORT TO BE ON MAST WHERE DROP CONDUCTORS ATTACH E. HAVE APPROVED PLANS ON SITE |
|
| 07/18/2008 | ELECTRIC - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1. LARGER THAN #8 IN RACEWAYS TO BE STRANDED - 310.3 2. INSTALL POA ON SUPPORTED RISER 3. BOND PER 250.92 (#8 PREVIOUS) 4. PROTECT GROUNDING ELECTRODE CONDUCTOR 250.64 (#11 PREVIOUS) 5. CLEAN EXCESS DIRT & FOREIGN MATERIAL FROM PANEL 110.12 6. FINISH INSTALLING RECEPTACLES 7. WHAT IS TO BE WITH FANS 8. DISCONNECTING MEANS NEEDED FOR INSTA-HOT 9. NO PLANS ON SITE WAITED 20 MIN. FOR BORIS 10. BORIS IS THREATENING INSPECTOR |