Inspection History Details
Inspection Status: Approved
Inspection History: MECHANICAL - ABOVE CEILING
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/23/2008 | MECHANICAL - ABOVE CEILING | Approved | IVRS - Inspection :* | |
| 06/20/2008 | MECHANICAL - ABOVE CEILING | Partial Approval | IVRS - Inspection :* 1. REMOVE DEMO MATERIAL 2. INSULATE BRANCH FITTINGS 3. PROVIDE STRAPS AS NEEDED 4. PROVIDE PROPER HANGERS ON CONDENSATE PIPING |
|
| 06/10/2008 | MECHANICAL - ABOVE CEILING | Partial Approval | IVRS - Inspection :* SUPPORT FLEX DUCTS MAX. 5' SPACING NO SAGS MORE THAN 1 1/2" IN 5' PLANS REQUIRE COPPER CONDENSATE DRAINS |