Inspection History Details
Inspection Status: Approved
Inspection History: ELECTRIC - INTERMEDIATE
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/27/2008 | ELECTRIC - INTERMEDIATE | Approved | IVRS - Inspection :* | |
| 06/23/2008 | ELECTRIC - INTERMEDIATE | Not ready for Inspection | IVRS - Inspection :* CANCELED BY CONTRACTOR |
|
| 06/20/2008 | ELECTRIC - INTERMEDIATE | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1. PROPERLY SUPPORT DATA/TELEPHONE CABLES TO BE SUPPORTED EVERY 6' 2. INSTALL ALL LIGHT FIXTURES 3. LIGHT FIXTURES TO HAVE TIE WIRES TO BUILDING STRUCTURE 4. ALL LOW VOLTAGE CABLING TO BE PROPERLY SUPPORTED 5. HAVE WIRING ABOVE CEILING THATS NOT TERMINATED 6. HAVE OPEN JUNCTION BOXES 7. REMOVE ALL OLD WIRING 8. REMOVE CABLE NOT TO BE USED ABOVE DROP CEILINGS 9. HAVE ELECTRICAL CONTRACTOR GO THROUGH ENTIRE JOB |
|
| 06/13/2008 | ELECTRIC - INTERMEDIATE | Partial Approval | IVRS - Inspection :* OK GROUNDED J-B0XES WITH #12 SOLID, GREEN GROUND SCREW - OK WALLS |
|
| 06/10/2008 | ELECTRIC - INTERMEDIATE | Partial Approval | IVRS - Inspection :* GROUND ALL METAL BOXES. OK WALLS. |