Permit: T08CM00457

Parcel: 110055340

Inspection Status: Approved

Inspection History: PLUMBING - INTERMEDIATE

Date Description Inspector Results Comments
05/19/2008 PLUMBING - INTERMEDIATE Approved IVRS - Inspection :*
LINER INSTALLED WITHOUT INSPECTION
WATER TEST TO FLOOD LEVEL OK
05/16/2008 PLUMBING - INTERMEDIATE Denied IVRS - Inspection :
See detailed listing on site.| 999*
PROVIDE WATER TEST TO FLOOD LEVEL
ABV CEILING OK EXCEPT STEAM UNIT NOT YET INSTALLED
04/11/2008 PLUMBING - INTERMEDIATE Partial Approval IVRS - Inspection :*
NEED TO SEE SHOWER SET
FLANGE OK
OK TO COVER WALLS
OK TO COVER OVERHEAD
04/10/2008 PLUMBING - INTERMEDIATE Partial Approval IVRS - Inspection :*
1. ALL FIXTURES REQUIRE SHUT OFF'S
2. NEED TO SEE THE SHOWER INSTALLED AND MOP SINK
3. SECURE RISERS MID-STORY

ABS IS TO BE SUPPORTED AT EACH CHANGE OF DIRECTION
OR ELEVATION AND AT THE END OF BRANCHES THEN NO MORE THAN FOUR FEET BETWEEN HANGERS

ABS SHIM NOT APPROVED SUPPORT
04/07/2008 PLUMBING - INTERMEDIATE Denied IVRS - Inspection :
See detailed listing on site.| 999*
- FIP THREADED FITTINGS SHALL NOT BE CONCEALED
SEE UPC IS #5
- INSTALL SOLVENT WELD TEST TEES
- SUPPORT HORIZONTAL ABS IN WALLS TO PROTECT FROM SHARP METAL
- SUPPORT ABV CEILING VENTS PER T 3-2 AND PLAN SPECS
- SECURE RISERS MID-STORY
- SECURE DROP EAR ELL AT SHWR HEAD
- INSULATE PER SPEC OR PROVIDE ARCHITECT APPROVAL AND SEAL ALL JOINTS