Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - INTERMEDIATE
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/30/2008 | PLUMBING - INTERMEDIATE | Approved | IVRS - Inspection :* CLOSET FLANGES OK |
|
| 06/27/2008 | PLUMBING - INTERMEDIATE | Partial Approval | IVRS - Inspection :* ALL AREAS DWV THRU ROOF OK WATER HAMMER ARRESTORS OK ABOVE CEILING IN 128 & 110 OK RECALL FOR CLOSET FLANGES PRIOR TO STOOL |
|
| 06/17/2008 | PLUMBING - INTERMEDIATE | Partial Approval | IVRS - Inspection :* THIS INSPECTION FOR RESTROOMS #109, 111 AND MOP SINK ROOM #110 ABOVE CEILING, PLEASE COMPLY WITH NOTES FROM 6/13/008 INSPECTION & PROVIDE WATER HAMMER ARRESTOR FOR FLUSH VALVES IN RESTROOMS AS REQUIRED BY 2006 UPC |
|
| 06/13/2008 | PLUMBING - INTERMEDIATE | Denied | IVRS - Inspection : See detailed listing on site.| 999* SUPPORT OVERHEAD HW PIPING PER PEX INSTALLATION STANDARDS 32" AND USE PIPE SUPPORTS |
|
| 06/06/2008 | PLUMBING - INTERMEDIATE | Partial Approval | IVRS - Inspection :* PROVIDE ENGINEERS STAMPED SEALED LETTER FOR PEX AND ARMOR FLEX INSULATION |
|
| 06/03/2008 | PLUMBING - INTERMEDIATE | Partial Approval | IVRS - Inspection :* 1. DWV CORRECTIONS OK 2. MIDDLE PLUMBING WALL OK TO COVER 3. TRIM OUT ALL CLEANOUT/TEST TEES FOR FINAL 4. DFS EXCEPT AT 126 OK TO COVER 5. NEED TO INSPECT PIPE INSULATION NOTE: HWR REQUIRES INSULATION PER CODE ALSO, NEED TO INSPECT ABV CEILING PIPE SUPPORTS PROVIDE LETTER FOR USE OF PEX |
|
| 06/02/2008 | PLUMBING - INTERMEDIATE | Partial Approval | IVRS - Inspection :* 1. DWV TEST THRU ROOF OK EXCEPT FOR P-9 IN HALL 126 2. CORRECT URINAL WASTE AND REMOVE UNACCESSIBLE PVC FEMALE THREADS 3. PEX OK PER SMU. 4. SECURE OR INSULATE FOR NOISE 5. TEST ON WATER OK 6. INSULATE HW AND HWR PER PLAN SPECS. 7. RECALL FOR INSPECTION 8. CLOSET FLANGES REQUIRE FIRM BASE AND FASTENERS 9. SEE UPC IS #9 |
|
| 05/22/2008 | PLUMBING - INTERMEDIATE | Not ready for Inspection | IVRS - Inspection :* 1) THIS INSPECTION FOR GAS SYSTEM, BECAUSE OF CHANGES AND DEMO PROCESS, ALL PIPING WILL REQUIRE TO BE TESTED AND MEET 2006 UPC REQUIREMENTS |