Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Inspection Status: Approved

Inspection History: PLUMBING - INTERMEDIATE

Permit Number - T08CM00390

Inspection Description - PLUMBING - INTERMEDIATE

Inspection Status - Approved

Date Description Inspector Results Comments
10/09/2008 PLUMBING - INTERMEDIATE Approved IVRS - Inspection :*
08/05/2008 PLUMBING - INTERMEDIATE Partial Approval IVRS - Inspection :*
NEED TO SEE FLANGES FASTENED TO FINISHED FLOOR
08/04/2008 PLUMBING - INTERMEDIATE Cancelled IVRS - RI canceled
07/14/2008 PLUMBING - INTERMEDIATE Denied IVRS - Inspection :
See detailed listing on site.| 999*
1. PROVIDE A WATER TEST ON DWV
2. INSTALL SWEEP ON DF TRAP ARM
3. PLAN SPECIFIES LAV CARRIERS
4. SUPPORT HORIZONTAL ABS ABV CEILING AT EACH END AND NOT TO EXCEED 4', IN WALL TO AVOID CONTACT W/SHARP METAL
5. WOMENS CLOSET STUB NOT 18" FROM SIDE WALL
06/26/2008 PLUMBING - INTERMEDIATE Partial Approval OK FOR CONCRETE
06/12/2008 PLUMBING - INTERMEDIATE Partial Approval IVRS - Inspection :*
ROUGH SOIL ONLY OK TO COVER
HARD CAP TEST TEE
INSTALL FOAM PIPE WRAPS PRIOR TO CONCRETE
ALSO, INSTALL FCO's IF SHOWN ON SHELL PLAN
ON FUTURE PROJECTS; INSTALL ABOVE SLAB TEST FITTINGS
ON ROUGH, SO THAT EACH JOINT GETS A WATER TEST. THANKS.