Inspection History Details
Inspection Status: Approved
Inspection History: ELECTRIC - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/15/2008 | ELECTRIC - FINAL | Approved | IVRS - Inspection :* | |
| 04/11/2008 | ELECTRIC - FINAL | Partial Approval | IVRS - Inspection :* 1. FINISH VDV CABLING 2. WAITING ON REVISED PLANS AND STAMPS |
|
| 04/09/2008 | ELECTRIC - FINAL | Denied | IVRS - Inspection : The wiring is not complete or does not comply with code.| 245* 1. PANEL DIRECTORY TO BE AS PER 408.4 - PERMANENT, LEGIBLE AND DISTINGUISHABLE FROM ONE ANOTHER - NO ABBREVIATIONS 2. FILL UNUSED OPENINGS IN BOXES 3. FINISH PREVIOUS NOTED ITEMS |
|
| 04/08/2008 | ELECTRIC - FINAL | Not ready for Inspection | IVRS - Inspection :* CANCELED |
|
| 04/07/2008 | ELECTRIC - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1. PROPERLY SUPPORT MC THROUGH CEILING 2. MC TO HAVE PROPER CONNECTOR TO BOX @ BOTH ENDS 3. REVISE PANEL DIRECTORY SO IT IS CORRECT AND NUMBER BREAKER 4. PLANS DO NOT SHOW NEW CKT TO TTB 5. LIGHTING HAS NOT BEEN DONE PER PLAN |