Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/27/2008 | PLUMBING - FINAL | Approved | IVRS - Inspection :* 1. PLEASE LEAVE A NAME AND CONTACT NUMBER WHEN SCHEDULING THIS INSPECTION 2. SALES OFFICE LOCKED REINSPECTED: PLAN CORRECTION SHOWS WATER CLOSET VENT SEPARATE FROM WASHER & KS OK TO COVER |
|
| 02/06/2008 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1. NOT INSTALLED PER PLAN 2. WET VENTED SECTION FROM KS TO WC TO BE 3" 3. TRAP FOR WASHER TO BE ROUGHED IN A MINIMUM OF SIX INCHES ABOVE FINISHED FLOOR MAXIMUM OF 18" ABOVE FINISHED FLOOR. STAND PIPE TO BE 18"-30" IN LENGTH 4. NOTE: HAMMER ARRESTORS REQUIRED AT WASHER BOX |