Inspection History Details
Inspection Status: Approved
Inspection History: FRAMING
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/31/2010 | FRAMING | Approved | IVRS - Inspection :* | |
| 03/05/2010 | FRAMING | Partial Approval | IVRS - Inspection :* | |
| 12/01/2009 | FRAMING | Partial Approval | ||
| 11/25/2009 | FRAMING | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) NAIL PROTECT KIT. SINK ABS AT BOTTOM PLATE 2) GROUND METAL BOXES 3) 2, 7 AND 8 ? |
|
| 11/17/2009 | FRAMING | Partial Approval | IVRS - Inspection :* 1) MAX 24" STUD AT FURNACE 2) DOES FURN GET AT CUT OFF SENSOR FOR 2ND CONDENSATE LINE ? 3) BANG PLATE, ALL PIPES, WIRES, NAIL PROTECTION CLOSER THAN 1 1/4" TO EDGES 4) GROUND ALL METAL BOXES 5) APPROVED FAN BOXES 6) FLOOR DECK 6 & 10 FASTENING 2 1/2" DECK SCREWS 7) NO LISTING ON FLEX DUCT R-8 INSUL. MIN 8) NAIL INTERIOR SHEAR 12" ON CENTER 16D/BOTTOM PLATE LSTA30 PAGE 149 SIMPSON 30" LONG 1 1/4 WIDE 22 10D'S |
|
| 03/17/2009 | FRAMING | Not ready for Inspection | IVRS - Inspection :* 1) FRAMING LOOKS OK BUT IS, DONE WITH INTERMEDIATE INSPECTIONS |