Permit: T08CM00263

Parcel: 11616301J


Addresses:

705 N FREEWAY

Inspection Status: Approved

Inspection History: MECHANICAL - ABOVE CEILING

Date Description Inspector Results Comments
11/20/2009 MECHANICAL - ABOVE CEILING Approved IVRS - Inspection :*
11/18/2009 MECHANICAL - ABOVE CEILING Partial Approval IVRS - Inspection :*
1) PROVIDE ENGINEERS APPROVAL TO EXCEED 8' FLEX LENGTH ALLOWED
2) OK TO TILE 1ST FLOOR
11/13/2009 MECHANICAL - ABOVE CEILING Not ready for Inspection IVRS - Inspection :*
11/04/2009 MECHANICAL - ABOVE CEILING Partial Approval IVRS - Inspection :*
1) DUCT FIRE/SMOKE DETECTOR DAMPER INSTALLATION X 5 OK
2) PROVIDE MEANS FO ACTIVATION
10/27/2009 MECHANICAL - ABOVE CEILING Partial Approval IVRS - Inspection :*
10/21/2009 MECHANICAL - ABOVE CEILING Partial Approval IVRS - Inspection :*
10/19/2009 MECHANICAL - ABOVE CEILING Denied IVRS - Inspection :
See detailed listing on site.| 999*
10/08/2009 MECHANICAL - ABOVE CEILING Partial Approval IVRS - Inspection :*
1) WEST SIDE 1ST FLOOR CORRIDOR OK TO ROCK-MECH ONLY
2) CORRIDOR SOFFIT NORTH OF RESTROOMS 1ST FLOOR OK TO ROCK-MECH ONLY
10/05/2009 MECHANICAL - ABOVE CEILING Partial Approval IVRS - Inspection :*
1) ALL PVC JOINTS TO HAVE PRIMER, ALL PRIMER TO BE PURPLE IN COLOR
2) HORIZONTAL UNIT IN LAUNDRY DOES NOT HAVE PROPER CLEARANCE
3) ALL HORIZONTAL UNITS TO HAVE PROPER CLEARANCE
4) CEILING CANS TO BE FRAMED MIN. 3 SIDES
5) PROVIDE O.S.A. DAMPERS
09/24/2009 MECHANICAL - ABOVE CEILING Partial Approval IVRS - Inspection :*
1) OK TO ROCK RESTROOMS ALL 1ST FLOOR
09/18/2009 MECHANICAL - ABOVE CEILING Partial Approval IVRS - Inspection :*
1) FRAME THE REST OF RESTROOM CEILINGS, INSTALL FANS, THEN RESCHEDULE INSPECTION
2) OK TO SHEETROCK 10 UNITS AT NORTH END OF BLDG ONLY, 1ST FLOOR
09/17/2009 MECHANICAL - ABOVE CEILING Partial Approval IVRS - Inspection :*
1) PROVIDE SCREWS AT ALUM. PIPE TO RIDGID DUCT CONNECTIONS
2) ROOM 136 NO E.F. OR DUCT INSTALLED
09/11/2009 MECHANICAL - ABOVE CEILING Partial Approval IVRS - Inspection :*
1) V TAC DUCT OK TO COVER
09/04/2009 MECHANICAL - ABOVE CEILING Not ready for Inspection IVRS - Inspection :*
09/03/2009 MECHANICAL - ABOVE CEILING Partial Approval IVRS - Inspection :*
1. PROVIDE PROPER CLEARANCE AND ACCESS TO ALL EQUIPMENT
2. PROVIDE FIRE CAULK AROUND EXHAUST FAN DUCT AT CEILING PENETRATIONS

THIRD FLOOR RESTROOM EXHAUST FANS OK TO COVER
04/02/2009 MECHANICAL - ABOVE CEILING Partial Approval IVRS - Inspection :*
AHU SUPPORTS 1ST FLOOR OK