Inspection History Details
Inspection Status: Approved
Inspection History: ENGINEERING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/21/2008 | ENGINEERING - FINAL | Approved | ||
| 02/28/2008 | ENGINEERING - FINAL | Not ready for Inspection | 1) COMPLETE THE INSTALLATION OF LIGHTING PER PLAN - 2 OPEN HOLES >6' DEEP IN PLAYGROUND. 2) INSTALL WALL OPENING IN EXISTING BLOCK WALL AT NE CORNER OF PLAY GROUND TO ALLOW FOR SURFACE WATER DRAINAGE, PER YOUR APPROVED PLAN. 3) INSTALL A DRAINAGE SWALE ALONG EAST AND SOUTH PERIMETER AS SHOWN ON PLANS. |