Inspection History Details
Inspection Status: Approved
Inspection History: EXCAVATION/LAYOUT REBAR & ZON
Permit Number - T08CM00224
Inspection Description - EXCAVATION/LAYOUT REBAR & ZON
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
02/13/2009 | EXCAVATION/LAYOUT REBAR & ZON | Approved | IVRS - Inspection :* | |
02/04/2009 | EXCAVATION/LAYOUT REBAR & ZON | Not ready for Inspection | IVRS - Inspection :* | |
01/30/2009 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* 1. SW TRASH ENCLOSURE BLDG. #3 FOOTING 2. TERRACON SPECIAL INSPECTED |
|
01/28/2009 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* 1. NE & SE CORNERS 10' APRON POURED 2. TERRACON SPECIAL INSPECTED |
|
01/22/2009 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* FIRST TRUCK DOCK ON WEST END STEEL REINFORCEMENT @ SLAB |
|
01/21/2009 | EXCAVATION/LAYOUT REBAR & ZON | Not ready for Inspection | IVRS - Inspection :* CANCELED BY CONTRACTOR |
|
01/20/2009 | EXCAVATION/LAYOUT REBAR & ZON | Not ready for Inspection | IVRS - Inspection :* | |
01/08/2009 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* LAST RETAINING DOCK WALL ON EAST END OK |
|
01/02/2009 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* 1) 4TH AND 5TH LOADING DOCK WALLS FROM WEST 2) 2ND EXTERIOR ENTRY LID FROM WEST |
|
12/30/2008 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* 1) THIRD DOCK RAMP WALL REINFORCEMENT FROM WEST 2) 1ST AND 3RD ENTRY LID MESH-OK |
|
12/24/2008 | EXCAVATION/LAYOUT REBAR & ZON | Denied | IVRS - Inspection : See detailed listing on site.| 999* NO ONE ON SITE TO TELL ME WHAT TO LOOK AT |
|
12/23/2008 | EXCAVATION/LAYOUT REBAR & ZON | Not ready for Inspection | IVRS - Inspection :* RAINED OUT |
|
12/22/2008 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* 1. BLDG. 3 2ND FROM THE WEST LOADING DOCK WALL 2. TERRACON SPECIAL INSPECTED |
|
12/19/2008 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* FIRST LOADING DOCK WALL ON WEST END |
|
12/18/2008 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | LAST TWO LOADING DOCK WALL FOOTINGS | |
12/17/2008 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* 1. STAIR WALLS @ NORTH/WEST CORNER 2. WESTERNMOST DOCK WALL - WEST 4 DOCK WALL FOOTINGS |
|
12/11/2008 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* RAMP (H/C) @ N/W CORNER AND SOUTH/WESTERN MOST TRUCK DOCK SIDE WALL FOOTING |
|
12/08/2008 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* 3RD STOREFRONT FROM EAST RAMP & WALK EXCEPT STAIRS |
|
12/03/2008 | EXCAVATION/LAYOUT REBAR & ZON | Not ready for Inspection | IVRS - Inspection :* | |
12/02/2008 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* 3RD ENTRY STOREFRONT RETAINING WALL FOOTING |
|
11/25/2008 | EXCAVATION/LAYOUT REBAR & ZON | Not ready for Inspection | IVRS - Inspection :* | |
11/24/2008 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* REINFORCEMENT STEEL @ FOOTING ON NORTH/WEST CORNER FOR ENTRY STOREFRONT RETAINING WALL OK |
|
11/20/2008 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* RETAINING WALL FOOTING @ 3RD STORE FRONT ENTRY |
|
11/19/2008 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* REINFORCEMENT STEEL @ RETAINING WALL/RAMP WALL FOOTINGS NORTH OF LINE "A"/BETWEEN 4.5 AND 5.5 |
|
11/18/2008 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* RETAINING WALL FOOTING @ SECOND STOREFRONT ENTRY OK |
|
11/12/2008 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* BUILDING COLUMN DRY PACK & POUR BACKS |
|
11/05/2008 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :*] BALANCE OF BUILDING CLOSURE POUR |
|
10/30/2008 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* CLOSURE POUR @ GRID LINE D/6 T 10 -- OK TO POUR |
|
10/29/2008 | EXCAVATION/LAYOUT REBAR & ZON | Not ready for Inspection | IVRS - Inspection :* CONTRACTOR CANCELED |
|
10/27/2008 | EXCAVATION/LAYOUT REBAR & ZON | Not ready for Inspection | IVRS - Inspection :* | |
09/24/2008 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* 1. PANELS 1, 60, 3, 61A, 61B, 64, 76, 77, 62 2. F2 FOOTING A.1-2.5 TO 4.5 SPREAD FOOTINGS 2-F7 A.1-4.5 AND 2.5 3-F5, A1-1.1, 1.5, 2 3. TO BE SPECIAL INSPECTED 4. REMAINING F/3 FOOTING 0-4.5 TO 6.5 |
|
09/23/2008 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* PANELS 7, 8, 9, 59, 65, 66, 67 TERRACON SPECIAL INSPECTED |
|
09/22/2008 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* 1. TILT PANELS 50, 11, 73 2. F2 FOOTING A1 5.5 TO 7.5 F9 FOOTING A1 5.5 |
|
09/19/2008 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* 2, 3, 4, 16, 17, 10, 56 OK TO POUR WITH SPECIAL INSPECTION |
|
09/18/2008 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* 1. D4.5 TO 1 F3 2. 1 B TO D F4, F2, F5, F9 3. COLUMN FOOTINGS A.1 AT 8.5, 9, 9.5 F5, F9 4. TO BE SPECIAL INSPECTED |
|
09/17/2008 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* PANELS 5, 6, 12, 48, 51 FOOTINGS A.1, 9.5-12 A.1 12.5, 13, 12 F5 & F9 |
|
09/16/2008 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* FOOTING LINE 13 B TO D TILT PANELS 14, 15, 23, 24, 26 FOOTING D 5 TO 8 F2, F3, F9, F7 TERRACON SPECIAL INSPECTED |
|
09/15/2008 | EXCAVATION/LAYOUT REBAR & ZON | Not ready for Inspection | IVRS - Inspection :* CONTRACTOR CANCELED |
|
09/12/2008 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* BLDG. #3 TILT PANELS #21, 20, 19, 18, 68, 69, 70 TERRACON SPECIAL INSPECTED |
|
09/11/2008 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* 22, 71, 72, 74, 75 - PANELS BLDG. 3 1. FOOTING D-7.3 TO 13 F3 2. TERRACON SPECIAL INSPECTED |
|
09/10/2008 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* BLDG. #3 PANELS 44, 49, 5.2, 5.3, 5.4, 55, 57, 58 OK TO POUR TERRACON SPECIAL INSPECTED |
|
09/08/2008 | EXCAVATION/LAYOUT REBAR & ZON | Not ready for Inspection | IVRS - Inspection :* CANCELED BY CONTRACTOR |
|
09/04/2008 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* PANELS 43, 45, 46, 47 TERRACON SPECIAL INSPECTED |
|
08/28/2008 | EXCAVATION/LAYOUT REBAR & ZON | Not ready for Inspection | IVRS - Inspection :* | |
08/26/2008 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* TILT PANEL REINFORCEMENT STEEL @ PANELS #39, 40, 41 & 42 OK TO POUR |
|
08/25/2008 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* PANEL 35-38 |
|
08/22/2008 | EXCAVATION/LAYOUT REBAR & ZON | Not ready for Inspection | IVRS - Inspection :* PER CONTRACTOR |
|
08/21/2008 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* PANELS 31, 33, 32, 34 OK TO POUR |
|
08/20/2008 | EXCAVATION/LAYOUT REBAR & ZON | Not ready for Inspection | IVRS - Inspection :* CANCELED BY CONTRACTOR |
|
08/19/2008 | EXCAVATION/LAYOUT REBAR & ZON | Not ready for Inspection | IVRS - Inspection :* | |
08/18/2008 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* PANELS 25-27-28-29-30 TERRACON SPECIAL INSPECTED |
|
08/14/2008 | EXCAVATION/LAYOUT REBAR & ZON | Not ready for Inspection | IVRS - Inspection :* CANCELED BY CONTRACTOR |
|
08/13/2008 | EXCAVATION/LAYOUT REBAR & ZON | Cancelled | CANCELED BY CONTRACTOR | |
07/24/2008 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* 3 PEDESTAL FOOTINGS & PEDESTALS A.1 - 4.5, 5.5, 5 |
|
07/23/2008 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* CONCRETE PEDESTAL A.1/7 C.8/7 TERRACON SPECIAL INSPECTED |
|
07/22/2008 | EXCAVATION/LAYOUT REBAR & ZON | Not ready for Inspection | IVRS - Inspection :* CANCELED BY CONTRACTOR |
|
07/17/2008 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* PIERS LINE A.1 8.5, 9, 9.5 SPECIAL INSPECTED |
|
07/15/2008 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* SPREAD FOOTINGS D-7 COLUMN FOOTINGS A.1-8.5, 9, 9.5 F7 FOOTING B-8 F5 FOOTING COLUMN PIERS B-12.8 A.1-12 SPECIAL INSPECTED |
|
07/14/2008 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* COLUMN FOOTINGS LINE 7 - A, B PIERS A1-12.5, 12.8 A.5-12.8 OK TO POUR |
|
07/11/2008 | EXCAVATION/LAYOUT REBAR & ZON | Not ready for Inspection | IVRS - Inspection :* CANCELED BY CONTRACTOR |
|
07/09/2008 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* 1. CP2 FOOTINGS 12.8 - 1.2, A.5, B A.2-12, 12.8 (5) TOTAL 2. INTERIOR COLUMN FOOTING F5 LINE B-9, 10, 11, 12, C-12 |
|
07/03/2008 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* COLUMN FOOTINGS B-7, C-7, C12 OK TO POUR SPECIAL INSPECTED |
|
07/02/2008 | EXCAVATION/LAYOUT REBAR & ZON | Not ready for Inspection | IVRS - Inspection :* | |
07/01/2008 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* COLUMN FOOTINGS B 1, 2, 3, 4, 5, 6 C 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11 SPECIAL INSPECTED |