Inspection History Details
Inspection Status: Approved
Inspection History: ENGINEERING - FINAL
Permit Number - T08CM00223
Inspection Description - ENGINEERING - FINAL
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
04/27/2009 | ENGINEERING - FINAL | Approved | NEED LETTER FROM ENGINEER ADDRESSING DRAINAGE AT LOADING DOCK. WILL HOLD T.I. ON SUITE #180 (T09CM00355) UNTIL LETTER IS RECEIVED. | |
04/10/2009 | ENGINEERING - FINAL | Partial Approval | OK for temp C of O. Contractor needs to: 1- Cut all brush and and remove trash from spillway. 2- Provide as-builts for loading dock, westside building. 3- Address ponding in trash enclosure, eastside building. 4- Remove material northside of project, went over with super. |
|
03/27/2009 | ENGINEERING - FINAL | Partial Approval | OK for temp C of O. Contractor nneds to complete all work. |