Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/23/2008 | PLUMBING - FINAL | Approved | IVRS - Inspection :* RECEIVED BACTERIA REPORT FOR POTABLE WATER |
|
| 07/21/2008 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1. PROVIDE INSULATION MINIMUM 8' IN & 8' OUT OF WATER HEATER PER 2006 IECC REQUIREMENTS 2. PROVIDE BACTERIA REPORT FOR POTABLE WATER 3. COMPLETE INSTALL OF SINK 4. COMPLETE LEAK DETECTOR SYSTEM FOR WATER HEATER AND CHILLER 5. INSTALL CHILLER PIPING PER DETAIL 2 PO 7.01 WITH BACKFLOW CERTIFICATIONS |