Inspection History Details
Inspection Status: Not ready for Inspection
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/23/2008 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* REINSPECTION FROM YESTERDAY COURTESY PROVIDED BECAUSE CUSTOMER DID NOT HAVE TIME TO RECAL FOR INSP. - PIPING TO WH AND STOVE ONLY - NO FURNACE OR PIPING TO TEST OK - GAS CLEARANCE GIVEN - COMPLETE THE REMAINDER OF PREVIOUSLY NOTED CORRECTIONS FOR FINAL APPROVAL |
|
| 01/17/2008 | PLUMBING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* - INSTALL LISTED PIPE COUPLINGS NOT THREAD PROTECTORS - INSTALL FLASHINGS AT ROOF PENETRATIONS - TEST WITH A 15 PSI GAUGE - HAVE PRESSURE ON SYSTEM PRIOR TO INSPECTION - WRAP ALL BELOW GRADE TOOL MARKS - INSTALL RELOCATED WATER HEATER ON CONCRETE PAD, 4" ABOVE DIRT - TYPE B VENT REQUIRED, ALSO, CORRECT UNDERSIZED WATER PIPING - SECURE ENCLOSURE - INSTALL SEDIMENT TRAP - HARD PIPE GAS INTO ENCLOSURE - PIPE T&P DRAIN TO 6" ABOVE GROUND - BOND TO ELECTRIC GROUND OR WATER PIPE - SHUT OFF VALVE REQUIRED AT HOUSE - NO FUTURE TEE CONNECTIONS ALLOWED UNLESS SHOWN ON PLAN - SECURE PIPE DROP BEHIND STOVE - FURNACE SHOWN ON PLAN IS NOT INSTALLED |