Inspection History Details
Inspection Status: Approved
Inspection History: ROOF NAILING
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/10/2013 | ROOF NAILING | Approved | IVRS - Inspection :* | |
| 07/09/2013 | ROOF NAILING | Cancelled | IVRS - RI canceled | |
| 09/09/2008 | ROOF NAILING | Partial Approval | 1) LARGE HANGER HU5.125/12 SIMPSON CALLS FOR 16D NAILS (22) INSIDE FLANTE, 16D BOX GAV USED NEED A CALC. FOR LOAD (2,950 LBS) WILL CARRY IF COMMONS USED 2) CONNECTION FLOOR JOIST TO LEDGER, OSB NOT TIED TOGETHER, CAN SCREWS BE USED IN HANGER FLANGE FOR WITHDRAWL 3) DON'T USE 8D'S IN LUS28 HANGERS, SIMPSON CALLS FOR MIN. 10D 4) LEDGER LAGS TO BE AT 16 ON CENTER |