Inspection History Details
Inspection Status: Approved
Inspection History: ENGINEERING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/30/2008 | ENGINEERING - FINAL | Approved | SEE ATTACHED LETTER FROM TUSD DIRECTOR OF BONDS MARCUS E. JONES R.A. | |
| 10/15/2008 | ENGINEERING - FINAL | Denied | 1. PROVIDE CONCRETE SURFACE TO EXISTING 6' SIDEWALK PER PLAN PAGE 102.3 . PLEASE ADDRESS A.D.A. ACCESS AND RAINWATER SCUPPER/DRAINAGE. 2. PROVIDE POSITIVE DRAINAGE AROUND TICKET BOOTH. 3. PROVIDE ROCK RIP RAP ON 2:1 SLOPE ON EAST SIDE OF BLDG. 4. CLEAN UP AND REMOVE ALL CONSTRUCTION MATERIAL AND DEBRIS. 5. PROVIDE C.O.T. APPROVED DRAWING WITH ENGINEERING STAMP. |