Permit: T08CM00039

Parcel: 13329001A


Addresses:

545 N CAMINO SECO

Inspection Status: Approved

Inspection History: EXCAVATION/LAYOUT REBAR & ZON

Date Description Inspector Results Comments
06/12/2009 EXCAVATION/LAYOUT REBAR & ZON Approved IVRS - Inspection :*
NE STAIRS @ LANDINGS: DETAILS #D, PAGE SD-.3.1;
#6 PAGE SD-3:2 -- OK TO POUR
06/11/2009 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
NW STAIRS AS PER DETAIL #A PAGE SD-3.1; #6 PAGE SD-3.2
POURED AT TIME OF INSPECTION PARTIAL PLAN "A"
06/03/2009 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
1) SOUTH EAST STAIRS DETAILS B, PAGE SD-3; H PAGE SD-3.1; FOOTING FOR RETAINING WALL EXTENSION RE: SK-001 DETAIL #124 PAGE S4.2-OK TO POUR PROGRESS AREAS
06/02/2009 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
SOUTH STAIRS & CONCRETE BENCHES: DETAILS #123,
PAGE S4.2 AND DETAILS A,E,F - PAGE SD3.1 -- OK TO POUR PROGRESS AREAS
05/05/2009 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
STAIR FOOTINGS (SE) APPROX. 36';
STAIR FOOTING (NE) APPROX. 26';
DETAILS PARTIAL PLAN: A & B, PAGE SD-3;
#125A, PAGE S4.2 -- OK TO POUR PROGRESS AREAS (*)

(*) NOTE: RECEIVED RFI DATED 4/27/09
RE: DETAIL #1, PAGE S-1.1 STATES IT IS ACCEPTABLE TO USE 40 GRADE #4 REBAR IN LIEU OF #60 GRADE #4 REBAR
IN RETAINING WALLS
04/17/2009 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
RETAINING WALL FOOTINGS ON SOUTH SIDE OF GYM FOR RAMP AND STAIRS @ SWC OF GYM OK
SPECIAL INSPECTION IN COMPLIANCE
04/15/2009 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
NORTH RAMP FOOTINGS AS PER DETAILS #125, 125A, 127, 128 ON PAGE S4.2 -- OK TO POUR FOOTINGS

ENSURE ALL DEBRIS AND TRASH IS REMOVED FROM FOOTINGS BEFORE POURING
04/02/2009 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
NE DEPRESSED SLAB @ CONCRETE SLAB TURNDOWN
DETAIL #102; PAGE S4.1 - OK TO POUR SLAB & TURNDOWN AREA
02/26/2009 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
COLUMN FOOTINGS #1, 2, 5 AS PER SPECIAL INSPECTION 2/25/09 (POURED)
02/25/2009 EXCAVATION/LAYOUT REBAR & ZON Not ready for Inspection IVRS - Inspection :*
WILL CHECK SPECIAL INSPECTION REPORT
02/06/2009 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
NW STAIRS CONCRETE RETAINING WALL AS PER DETAILS #129-130 PAGE S4.2 -- OK TO POUR PROGRESS AREA
01/30/2009 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
3 @ HOUSEKEEPING PADS - ROOM #201; AS PER DETAIL #213 PAGE S5.1 - ENSURE PADS ARE CLEAN BEFORE POURING
OK TO POUR
01/29/2009 EXCAVATION/LAYOUT REBAR & ZON Not ready for Inspection IVRS - Inspection :*
01/28/2009 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
NW FOOTING FOR EXTERIOR STEPS APPROX. 24' - OK TO POUR
DOWELED AS PER SPECIAL INSPECTION
12/11/2008 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
FOOTINGS FOR RESTROOMS #113, 114, RISER ROOM #103
STORAGE ROOMS #111, 112 -- OK TO POUR FOOTINGS
10/02/2008 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
NORTH SIDE OF STRUCTURE - 3 @ MASONRY COLUMN
FOOTING (M2/M6), 1 @ M2/F8 COLUMN FOOTING,
WEST RETAINING WALL - W1/F2 FOOTING - DETAIL #122;
PAGE S4.2; STAIRS (UP) - B3, F1 FOOTING;
WEST SIDE F4 FOOTING,
EAST SIDE F6 FOOTING
ENSURE ALL EXCESS DIRT & DEBRIS IS REMOVED FROM FOOTINGS BEFORE POURING PROGRESS AREAS
07/16/2008 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
FOOTING (SE PORTION) FOR LOBBY #100; SW CORNER (EXTERIOR) FOOTINGS - OK TO POUR PROGRESS AREAS
07/08/2008 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
GYM EXTERIOR WALL (SOUTH); EXCEPT SW CORNER FOOTINGS; NORTH INTERIOR WALL (GYM) FOOTING
OK TO POUR PROGRESS AREAS
04/28/2008 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
EAST FOOTING (F2) AS PER DETAIL #111 PAGE S4.1;
WEST FOOTING (F2) AS PER DETAIL #121, PAGE S4.2
OK TO POUR PROGRESS AREAS