Inspection History Details
Inspection Status: Not ready for Inspection
Inspection History: BUILDING - FINAL
Permit Number - T08CM00012
Inspection Description - BUILDING - FINAL
Inspection Status - Not ready for Inspection
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
01/06/2009 | BUILDING - FINAL | Not ready for Inspection | VISITED SITE TO SPECIFICALLY LOOK AT STAIRS. STAIRS MAY COMPLY WITH INTENT OF R311.5 & R311.5.8. BY ALTERING "SPIRAL" PORTION OF STEPS SO THAT RUN IS CONSISTENT OVER THE 3 STEP SPAN. A) EACH STEP TO BE ROTATED FROM A SINGLE VERTICAL LINE EQUAL TO CORNER AT THE INSIDE OF THE STEP. B) EACH STEP TO HAVE AN EQUAL RUN OF 7.5" OR GREATER WHEN MEASURED AT A POINT 12" FROM THE ROTATIONAL POINT. C) OWNER WILL BE REQUIRED TO ADD AN ADDITIONAL HANDRAIL ALONG "OUTSIDE" CORNER OF STAIR RUN (ENTIRE RUN FROM 1ST TO 2ND FLOOR) |
|
12/31/2008 | BUILDING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1) CANCELLED PER R.D. |
|
12/23/2008 | BUILDING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) STAIRS NOT PER CODE-WILL NEED TO GET AN APPEAL FROM BLDG OFFICIAL OR BUILD TO CODE 2) MISSING ARC-FAULT BREAKER IN BEDROOM |
|
12/19/2008 | BUILDING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1) CANCELLED PER CONTRACTOR |
|
12/18/2008 | BUILDING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) NO ACCESS 10:30 AM, CALLED NUMBER-NO ANSWER 2) LEFT MESSAGE ON MACHINE TO RECALL INSPECTION |