Inspection Status: Continued
Inspection History: STORMWATER FOLLOW-UP INSP
| Date |
Description |
Inspector |
Results |
Comments |
| 12/15/2010 |
STORMWATER FOLLOW-UP INSP |
|
Continued |
NO CONCERNS AT THIS TIME. |
| 06/23/2010 |
STORMWATER FOLLOW-UP INSP |
|
Continued |
NO CONCERNS AT THIS TIME. ROUGH GRADING ALMOST COMPLETE FINAL GRADING IS STILL NEEDED. THE DEVELOPER HAS COMPLETED THE ROUGH FRAMING FOR THE BUILDING BUT HAS NOT PLACED ANY OF THE ASPHALTIC CONCRETE FOR THE PARKING LOT. |
| 06/23/2010 |
STORMWATER FOLLOW-UP INSP |
|
Continued |
NO CONCERNS AT THIS TIME, MISSING SIDEWALK, DRIVEWAY, AND AC PAVEMENT AT THIS TIME. ROUGH CONSTRUCTION OF THE BUILDING IS COMPLETE. |