Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit: T08BU02178

Parcel: 141113770

Inspection Status: Compliance

Inspection History: ENGINEERING PRE-CONSTRUCTION

Date Description Inspector Results Comments
07/07/2009 ENGINEERING PRE-CONSTRUCTION Compliance MET ONSITE WITH DEVELOPER TO LOOK AT THE WORK THAT WILL BE TAKING PLACE IN THIS AREA OVER THE NEXT MONTH. THIS SITE WILL BE MODERATELY GRADED DURING THE FIRST PHASES OF CONSTRUCTION TO REDUCE OVERALL WORK. THEY WILL CLEAR AND GRUBB ONLY THE AREAS THAT WILL BE AFFECTED BY THE CONSTRUCTION OF BUILDING FOOTERS AT THIS TIME, ALL OTHER AREAS WILL BE OPENNED AS NEEDED. A CONSTRUCTION ENTRANCE TO THE SITE WILL BE PROVIDED ONCE THEY HAVE STARTED PERFORMING THE CLEARING AND GRUBBING OPERATION. THE DEVELOPER HAS BEEN ADVISED OF THE CURRENT STORMWATER CONDITIONS THAT WILL BE ADHERED TO EVEN THOUGH THE SITE IS SMALLER THAN 1 ACRE. THEY WILL ENSURE THAT THEY MAINTAIN ALL TRACK OUT FROM THE SITE AND WILL REFRESH ALL SAND BAGS AT THE DRAINAGE INLET STRUCTURES AS NEEDED. DURING CONSTRUCTION THEY WILL MONITOR THE LOCAL DRAINAGE CHANNELS TO MAKE SURE THAT THEY DO NOT CAUSE ANY DAMAGE OR PLACE ANY MATERIALS INTO THE CHANNELS.